CIVIL AND BUILDING WORKS FOR WELL PAD #7,8 & 10 AREA – West Qurna Field 2nd Phase Project

Client: SAMSUNG IRAQ, SAMSUNG GEC, 500 Sangil-dong, Gangdong-gu, Seoul, Korea 134-090]. Iraq Branch Office with

OWNER: LUKOIL MID-EAST LIMITED.

POC: LUKOIL MID-EAST LIMITED

CIVIL AND BUILDING WORKS FOR WELL PAD #7,8 & 10 AREA – West Qurna Field 2nd Phase Project

Client: SAMSUNG IRAQ, SAMSUNG GEC, 500 Sangil-dong, Gangdong-gu, Seoul, Korea 134-090]. Iraq Branch Office with

OWNER: LUKOIL MID-EAST LIMITED.

POC: LUKOIL MID-EAST LIMITED

Supply and Erect a New Electrical Mobile substation 132 / 11 KV for Hilla1 – Hilla2 Resident Building in Babylon. 

Client: Babylon Province.

POC: Babylon Province.

Construction of 22 residential houses for the Al-Najaf refinery

Client: Midland Refiners Company

POC: Midland Refiners Company – AlNajaf Refiners

Abo Teban water treatment plant

Client:  Al-Anbar governorate

 

POC: AL-Anbar Water Directorateil

A MINES & UXO Technical Survey for the Survey Area in Abu Ghirab oil fields of Missan Oil Fields.

 

 

Client: CNOOC IRAQ LIMITED, a company duly incorporated in the British Virgin Islands, acting for and on behalf of FOD.

 

OWNER: (the "FOD Agreement") of MOC, CNOOC Iraq Limited, TP Missan Limited and Iraqi Drilling Company entered into

              the FOD Field Operating Division Agreement for the Missan Oil Fields.

 

POC: Liu Guozhi, HSE Dept, CNOOC Iraq limited (BVI), Tel China +86 139 2092 1806 - Tel: Iraq +964 7806 453 604

        E-mail: liugzh2@cnooc.com.cn, E-mail: liugzh@cnoociraq.com

Construction of 6" Flow line total length 47km

 

 

Brief Scope Of Work: Construction of 6" flow lines with a total length of 47 kilometers. This project includes transportation, stringing, bending, welding, Post Weld Heat Treatment (PWHT), Non-Destructive Testing, trenching, lowering, backfilling and Pre-commissioning. It Also includes the connection to end facilities at wellhead and OGM (Oil Gathering Manifold).

Client: China Petroleum Engineering & Construction.

 

 

Location: AHDEB Oïl Field /Wassit.

 

 

Duration: 23rd Of March 2013 to 10th Of October 2015.

Construction Of Tanks And Piping.

 

 

 

Brief Scope Of Work: Construction of one floating roof tank and three fixed roof tanks. The project includes civil works on foundation and mechanical construction of the base floor section with Cathodic protection. Erection up to roof level by means of vertical and horizontal welding. Also includes piping works of 1” – 8” pipework in between tanks.

 

Client: STX Heavy Industrial Company Limited.

 

Location: Diwanya power station.

 

Duration: 13th January 2012 to 5th of September 2012.

36” SHAMIYA TEMPORARY COMPRESSOR- HOT TAPPING PROJECT.

 

 

 

Brief Scope Of Work: Ard Alata Oil services Company has completed a contract by Basrah (BGC) to install a 20 inch tie-in valve and tee connection via hot tap to the 36" South Rumaila gas gathering headed - North Rumaila NGL plant pipeline.

This project was awarded in April 2017.

 

Client: Basrah (BGC) 

 

Location: North Rumaila NGL plant pipeline.

 

Duration: This project was awarded in April 2017.

Rehabilitation of Building & 5  Fuel Storage Tanks in Badyal Terminal

Client: Badyal Petroleum Co.

 

POC: Badyal Petroleum Co.- Iraq- Erbil

Chemical pumps for Degassing stations in Missan

Client: Missan Oil Company

POC: Technical Director in MOC

Mobile Air Pollution Lab

Client: Missan Oil Company

POC: Pollution Department - Missan Oil Company

Supplying 11 KV Switchgear for old KUT Substation.

 

 

 

 

Client: Wassite network diretorate

 

POC: Eng. Hussien Hashiem Faiad

Supplying 132 KV Central Break Disconnectors Switches.

Client: Nassyria power station

POC: High Voltage network Department

UPVC Pipes & Chlorination Instruments for Supplying Pumps.

Client: Wassite water diretorate

 

POC: Eng. Khaled Moumad Hussien

Construction New AL-Kafaat Substation 33/11 KV in Kut.

Client: Wassit Province.

POC: Wassit Province.

Many other projects were completed during this period

 

 

1 -

Project Name:  Completion of the Linking Road Between Strategic Line and PS2 Station

Client: S O C

Period: 120 Days

 

 

2 -

Project Name: Construction of Open Stores at North Rumaila

Client: S O C

Period: 180 Days

 

 

 

3 -

Project Name:  Construction of Concrete Bases for Submergible Pumping Equipment

Client: S O C

Period: 28 Days

 

4 -

Project Name: Preparation of Wells No M30 L29 in Nasiriya Oilfield

Client: S O C

Period: 90 Days

 

 

5 –

Project Name: Preparation of Wells No. Q22 N22 in Nasiriya Oilfield

Client: S O C

Period:  90 Days

6 -

Project Name: Preparation of Wells No. L22 K22 in Nasiriya Oilfield

Client: S O C

Period:  90 Days

7 -

Project Name: Construction of Safe Room for DS1

Client: ROO

Period:  30 Days

8 -

Project Name: Provision of Road Maintenance Service in South Rumaila Oilfield

Client: ROO

Period: 15 Days

9 -

 Project Name: Refurbishment of Al Shamia Degassing station at South of Rumaila

Client: ROO

Period: 160 Days

10 -

Project Name: Construction of Civil Department at North Rumaila

Client: ROO

Period: 240 Days

11 -

Project Name: Replacing Pipes of Safety Valve System for Separator Train in Shamia Degassing Station

Client:  ROO

Period: 200 Days

12 -

Project Name: Supplying of Concrete Support for Flow Line at North & South Rumaila

Client: ROO

Period: 1 year

 

13 -

Project Name: Construction of B.R.C Fence for ESP & Wellhead at North & South Rumaila

Client: ROO

Period: 1 year

 

14 -

Project Name: Earthworks for the Location of the New Oil Tanks in DS4 in North Rumaila

Client: ROO

Period: 50 Days

 

15 -

 Project Name: Paving of the Road of Al Zubair – Nasiriya 1600 m Length

Client: Basra GOV

Period: 180 Days

 

16 -

Project Name: Control of Work Station

Client: ROO

Period: 2 Years

 

17 -

Project Name: Supplying of Concrete Support for Flow Line at North & South Rumaila

Client: ROO

Period: 3 Years

18 -

 Project Name: Provision of Well Pads Construction

Client: ROO

Period: 1 Year

19 -

Project Name: Source Water Access Control Point for New Veolia Water Treatment Plant

Client: ROO

Period: 100 days